Power Engineering Services were recently called to an 11 KV fault on some GEC VMX switchgear, on inspection we found we required replacement primary bars, cable boxes and CTs. CK Beckett were able to assist us with critical spares from their stock. With their assistance and speedy reaction PES were able to have the client on line and fully operational within 48 hours.